INSTALLATION REFERENCE

Installation reference | Global | FUJITSU GENERAL

04:35

Fujitsu Services

OFFICE

Location :
UK
Completion :
2016
Outdoor unit :
27
Indoor unit :
120
Project summary :
The R22 replacement project. 145,000 square foot building, from warehousing and repairs through to light engineering. The entire two-storey building. Open plan working areas, multiple meeting rooms, small privacy rooms, a cafeteria, a data center and various kitchen areas.

C200 Office

OFFICE

OFFICE

Location :
Poland
Completion :
2016
Outdoor unit :
58
Indoor unit :
405
Project summary :
24692 m² seven floors 632HP The building functions for business space, conference rooms and fitness club. All Office premises are air-conditioned and heated (the only source of heating in the building).

Targowa 35 Office

OFFICE

Location :
Poland
Completion :
2014-2016
Outdoor unit :
40
Indoor unit :
260
Project summary :
8500 m² five floors Very interesting factory revitalization. The building functions for business space and conference rooms.

Nowe Orlowo Office / Apartments

OFFICE RESIDENTIAL

Location :
Poland
Completion :
2016
Outdoor unit :
52
Indoor unit :
136
Project summary :
Residential complex with some offices and shops, 4 four-storey buildings, Fujitsu was chosen due to compact size design and flexible piping design J-IIS series.

Piotr i Pawel Office

OFFICE

Location :
Poland
Completion :
2016
Outdoor unit :
11
Indoor unit :
92
Project summary :
4100 m² four floors Piotr and Paweł is one of the largest chain of supermarkets in Poland The building functions for business space and conference rooms. All Office premises are air-conditioned and heated (the only source of heating in the building).

Business Center "DOROHOFF" (Moscow)

OFFICE

Location :
Russian Federation
Completion :
2016
Outdoor unit :
10
Indoor unit :
119
Project summary :
Business Center (One of the Office Buildings).

Business Center "SENATOR" (Saint-Petersburg) Building 1

OFFICE

Location :
Russian Federation
Completion :
2015
Outdoor unit :
65
Indoor unit :
461
Project summary :
Business Center (One of the Office Buildings).

Chengdu Dangjian Journal Building

OFFICE

Location :
China
Completion :
2015
Outdoor unit :
51
Indoor unit :
260
Project summary :
Chengdu dangjian journal building is 12-story building and air conditioned area is 13000 square meter, 560HP. The building has a studio hall and control room on the 1st and 2nd floors, an office room on the 7th to 11th floors, a dining room and rest area on the 12th floor. The outdoor unit is installed on the rooftop.

Emergency Rescue Drills and Test Platform Construction Projects

OFFICE

Location :
China
Completion :
2016
Outdoor unit :
19
Indoor unit :
127
Project summary :
Emergency rescue drills and test platform construction projects is air conditioned area is 8345.18 square meter, 356HP. This building is height of 23.5m five floors the building functions for the laboratory, business space, information room.

Yixing East China Photoelectron Inductrial Park

OFFICE

Location :
China
Completion :
2015
Outdoor unit :
72
Indoor unit :
249
Project summary :
Yixing East China photoelectron Inductrial Park is 5-story building and air conditioned area is 16000 square meter, 1100HP. This building is the core project of Science Park, has factory exhibition area, work area, office area, rest area. The outdoor unit is installed on the rooftop.

Smooth You

SHOP

Location :
UK
Completion :
2015
Outdoor unit :
2
Indoor unit :
19
Project summary :
Hair and beauty salon.the salon has shops on both sides and apartments above.

Shopping Center EUROPE (Ufa)

SHOP

Location :
Russian Federation
Completion :
2017
Outdoor unit :
10
Indoor unit :
64
Project summary :
Shopping mall with office.

AUDI SHOWROOM

SHOP

Location :
India
Completion :
2016
Outdoor unit :
7
Indoor unit :
4
Project summary :
Jahnvi Motor Private Limited group was diversified into Automobile industry in 2012 as exclusive dealers in Tamil Nadu.
The 8000 sq.ft showroom is situated on Madurai-Dindigul NH Road, Samayanallur. The showroom is built with Audi’s global terminal concept.
It houses eight cars display inside the showroom and has set a benchmark for luxury car showroom in the region.

Box Park Al wasl / PK Gulf

SHOP

Location :
UAE
Completion :
2014
Outdoor unit :
84
Indoor unit :
166
Project summary :
BOXPARK is a distinctive retail and hospitality destination set in the heart of Jumeirah on Al Wasl Road. The development features 44 niche, high-end, retail, leisure and entertainment brands.

MERCURE HOTEL

HOTEL

Location :
AUS
Completion :
2015
Outdoor unit :
6
Indoor unit :
102
Project summary :
MERCURE HOTEL is 4-story, 4-star hotel. 95 guest rooms as well as resturant, bars, gymnasium and four conference rooms.

HAGL MYANMAR CENTER

HOTEL

Location :
Myanmar
Completion :
2015
Outdoor unit :
567
Indoor unit :
1909
Project summary :
Residential & Commercial project Office tower: 85701 m², 22storeys 5 star hotel: 37757m², 24storeys, 400rooms

HYCINTH HOTEL

HOTEL

Location :
India
Completion :
2014
Outdoor unit :
24
Indoor unit :
166
Project summary :
HYCINTH is a premium boutique hotel that offers a distinct and refined hospitality experience. The aims to revolutionise conventional notions of hospitality with innovative design choices.

Al Marian Double Tree Hilton Hotel

HOTEL

Location :
UAE
Completion :
2015
Outdoor unit :
50
Indoor unit :
250
Project summary :
DoubleTree by Hilton Resort & Spa Marjan Island is a 701-room hotel and leisure destination which enjoys a prime location on the trunk of Marjan Island, a cluster of five man-made islands in the upscale area of Al Hamra, Ras Al Khaimah.

Norwegian Christian Home and Health Center

PUBLIC FACILITY

Location :
USA
Completion :
2015
Outdoor unit :
6
Indoor unit :
122
Project summary :
The Norwegian Home first opened for service over a century ago (1903) in the Bay Ridge area in Brooklyn, NY. It started out caring for a small group of elderly women and carried on by a small dedicated group of Norwegian immigrants from Bay Ridge. Their name changed in 1911 to the Norwegian Christian Home for the Aged, when the charter broadened to admit men. When a skilled nursing facility was added in 1973 they adopted the present name “Norwegian Christian Home and Health Center”.

St. Patrick’s Catholic Church

PUBLIC FACILITY

Location :
USA
Completion :
2015
Outdoor unit :
2
Indoor unit :
14
Project summary :
The Grand Romanesque/Byzantine, St. Patrick’s Church on Main Street in Bay Shore, NY has been a South Shore landmark for nearly a century.
The building was dedicated in 1919.

Sichuan Gongmei Environmental Art Design Engineering Co., Ltd

PUBLIC FACILITY

Location :
China
Completion :
2016
Outdoor unit :
11
Indoor unit :
41
Project summary :
Sichuan Gongmei Environmental Art Design Engineering Co., Ltd is 2-story building and air conditioned area is 3202 square meter, 120HP.
This building has the exhibition hall, overview of the history exhibition hall. 

Changsha City People 's Court

PUBLIC FACILITY

Location :
China
Completion :
2015
Outdoor unit :
18
Indoor unit :
270
Project summary :
Changsha City People 's Court is a court that is a 7-story building and air conditioned 30000 squre meter, 760HP. The outdoor unit is installed on the rooftop.

Ramsey High School

SCHOOL

Location :
USA
Completion :
2016
Outdoor unit :
4
Indoor unit :
25
Project summary :
Three-story public high school built in 1937.

HIGH SCHOOL SOUTH WESTERN SYDNEY

SCHOOL

Location :
AUS
Completion :
2015
Outdoor unit :
3
Indoor unit :
15
Project summary :
New building including 10 classrooms, new refurbishment of class rooms for science, visual arts and intensive English.

AL MUROOJ PRIVATE SCHOOL

SCHOOL

Location :
UAE
Completion :
2015
Outdoor unit :
50
Indoor unit :
99
Project summary :
Abu Dhabi is an established private school located in Mohammed Bin Zayed City. The School is recognized and approved by ADEC.It has 44 classrooms and 1115 students.

LAKSHYA INTERNATIONAL SCHOOL (YOGESHWAR EDUCATION FOUNDATION)

SCHOOL

Location :
India
Completion :
2015
Outdoor unit :
28
Indoor unit :
122
Project summary :
This is a biggest international school in Ahmedabad city.This a self-financing school with current enrolment of more than 700 in classes Nursery to Ⅸ standard.

Changzhou City, the twenty-fourth middle school

SCHOOL

Location :
China
Completion :
2015
Outdoor unit :
5
Indoor unit :
35
Project summary :
Changzhou City, the twenty-fourth middle school is air conditioned area is 2000 squre.

RATAN JYOTI NETRALAYA - APOLLO SPECTRA

HOSPITAL

Location :
India
Completion :
2016
Outdoor unit :
19
Indoor unit :
79
Project summary :
With 12 centres across 9 cities – Bengaluru, Chennai, Delhi, Jaipur, Kanpur, Mumbai, Hyderabad, Gwalior and Pune, over 50,000 successful surgeries outcomes, with excellent clinical and over 700 leading doctors, Apollo Spectra Hospitals continue to set new standards in healthcare services.

Wuxi Dongbei Tong Community Hospital

HOSPITAL

Location :
China
Completion :
2015
Outdoor unit :
27
Indoor unit :
187
Project summary :
Wuxi Dongbei Tong Community Hospital is air conditioned area 6000 squre meter, 366HP. This building has become a redevelopment project property of a community hospital, there are a consultation room, a hospital room and a dining room.

ALEX PERRY HOTEL & APARTMENTS

RESIDENTIAL

Location :
AUS
Completion :
2015
Outdoor unit :
44
Indoor unit :
132
Project summary :
Hotel and residential apartment complex building 143 apartment across 11 levels, Studio hotel rooms and one and two bedroom apartment.

Emirates Flight Staff Accommodation Project

RESIDENTIAL

Location :
UAE
Completion :
2014
Outdoor unit :
81
Indoor unit :
521
Project summary :
Emirates Air has evolved into a globally influential travel and tourism conglomerate known the world over for our commitment to the highest standards of quality in every aspect of our business.
This building construction consist of Ground floor, 3 typical floors & roof used as staff accomudation.